Hyway Hyway
Hyway Hyway
Production order PO-26-0412 Demo 2 × 200/360 · Packing
Xero connected · synced 9:14am 19 Aug 2026
← The floor Packing
Pairs
2/2
none scrapped
Hours
7.7
against 7.9h estimated
Material issued
$3,254
of $3,254 planned
Scrap off the saw
4.50kg
3 cut plans run
Off the remnant rack
7.8m
metal not bought new
Routing
Standard minutes against booked, work centre by work centre.
SeqWork centreWhat happensWhoStatusStdBookedVariance
1 CUT Cutting — 4 rails at 3600mm, 26 rungs at 524mm Harinder Singh Done 70 min 67 -4%
2 DRILL Drilling — Rail jig, headplate and pin holes Harinder Singh Done 46 min 48 +4%
3 WELD Welding — 52 rung joins, 2 headplates Nelson De Villa Done 172 min 198 +15%
4 ASSY Assembly — Nose, lugs, pins, ID plate Harinder Singh Done 62 min 56 -10%
5 INSP Inspection — Proof load and dimensional check Oliver Brewer Done 70 min 78 +11%
6 PACK Packing — Bearers, strap, wrap, label Nick Kennedy Running 56 min 30 -46%
Cutting and nesting
What has to be cut to length, and how it was nested onto bar and remnant.
ProfilePiecesCut toTotal lengthCut planYieldOff the rack
EXT-200-SR
200 Series side rail extrusion
8 3,600mm 28.80m CP-26-0333 99.0% 0 · 0.0m
EXT-NOSE
Nose / toe extrusion
4 500mm 2.00m CP-26-0335 99.0% 1 · 2.0m
EXT-RUNG-HD
Heavy duty rung — Hyway profile
52 524mm 27.25m CP-26-0334 94.9% 1 · 5.8m
Material
Required against issued, priced at what the buyer last paid.
1 short
CodeMaterialBinRequiredIssuedOn handCost
GAS-ARG Argon E-size cylinder RM-E1 0.189 ea 0.189 9.42 $18.16
WIRE-5356 5356 MIG wire 1.2mm, 7kg spool RM-E1 0.095 spool 0.095 20.76 $11.16
EXT-200-SR 200 Series side rail extrusion
8 at 3600mm
RM-A1 28.800 m 28.800 284.30 $1,837.44
EXT-NOSE Nose / toe extrusion
4 at 500mm
RM-B1 2.000 m 2.000 279.80 $38.90
EXT-RUNG-HD Heavy duty rung — Hyway profile
52 at 524mm
RM-B1 27.248 m 27.248 -119.30 $704.36
PLATE-ID Serial identification plate RM-D1 4.000 ea 4.000 434.26 $16.80
RIVET-4 4mm rivet, stainless, pack of 500 RM-D1 0.016 pack 0.016 12.05 $1.18
STRAP-PP 19mm poly strapping, 1000m coil RM-E1 0.024 coil 0.024 5.80 $2.06
TIMB-BEAR Timber bearer 100×50, 1.2m RM-E1 4.000 ea 4.000 247.68 $29.60
WRAP-PAL Pallet wrap 500mm × 400m RM-E1 0.100 roll 0.100 20.67 $2.15
PIN-14-S 14mm steel pin, zinc plated RM-D1 8.000 ea 8.000 423.19 $92.80
PIN-CHAIN Pin retaining chain, 300mm RM-D1 8.000 ea 8.000 725.03 $31.20
PL-GUSS-6 6mm gusset plate 1200×600 RM-C1 0.200 sheet 0.200 13.40 $30.40
PL-HP-10 10mm headplate plate 2500×1250 RM-C1 0.400 sheet 0.400 2.05 $438.00
Planned material$3,254.21
Labour booked
8.0 hours off the floor against this order.
DateWhoWork centreMinutesDoneScrapNote
19 Aug Nick Kennedy PACK 30
19 Aug Harinder Singh ASSY 56 2
19 Aug Nelson De Villa WELD 198 2 1 Rung join reworked — porosity on the second pass
19 Aug Harinder Singh DRILL 48 2
18 Aug Oliver Brewer INSP 78 2
18 Aug Harinder Singh CUT 67 2
Ramps built
One serial per ramp, with the batch it came from and who signed it off.
SerialBuiltCapacityLengthBatchWelderInspectedStatus
HY-26-41204 17 Aug 7,500kg 3.6m VUA-24969 Dion Field Oliver Brewer In stock
HY-26-41205 15 Jul 7,500kg 3.6m VUA-24767 Nelson De Villa Oliver Brewer In stock
HY-26-41206 31 Jul 7,500kg 3.6m VUA-24045 Dion Field Oliver Brewer In stock
HY-26-41207 12 Aug 7,500kg 3.6m VUA-24780 Dion Field Oliver Brewer In stock