Job HJ-2026-0146 Demo Southland Transport Group · Custom ramps — Case 580SN backhoe
Xero connected · synced 9:14am 19 Aug 2026
← Jobs Packing Custom
Quote Q-2026-0428
Contract value
$9,550
incl $600 of variations
Quoted cost
$5,159
$3,198 material · 20.0h
Actual so far
$4,152
$3,397 material · 7.7h
Margin
46.0%
on the quote
Invoiced
$3,891
$4,475 received
The specification
Captured on the enquiry and unchanged since. Variations sit alongside it, not over it.
Case 580SN backhoe
All-up weight7,300kg
Axle / track load4,000kg
Track width2,240mm
Deck height1,120mm
Gradient30%
AttachmentLugs
The ramps
8,500kg
rated per pair
3.7m
length
600mm
rung width
200
profile
Anti-slip decking
Production
What is being built against this job.
OrderModelQtyStageHoursMaterialDue
PO-26-0412 200/360
7500kg Aluminium Ramps at 3.6m
2/2 Packing 7.7 / 7.9 $3,397 / $3,254 2 Oct
Variations
Priced and approved separately. The original quotation and specification stay as they were.
VariationWhat changedRaised byStatusValue
VO-2026-010 Additional 200mm length to clear a tailgate hinge Nick Harrison
6 Aug
Approved $600
Drawings and documents
The workshop only ever sees the current revision.
DocumentKindRevStatusFiled byWhen
Signed drawing approval Approval A Current Leigh Sharland 8 Aug, 14:40
HD-0146 Rev A — general arrangement Drawing A Current Oliver Brewer 9 Aug, 08:20
Site photos — deck height and attachment Photo A Current Nick Harrison 18 Jul, 15:10
Safe use and inspection booklet Safety 2026-1 Current Leigh Sharland 14 Aug, 10:00
Machine specification sheet — customer supplied Specification A Current Nick Harrison 21 Jul, 11:05
Ramps built on this job
Serial numbers stay against the job and the customer for the life of the ramp.
SerialModelBuiltBatchWelderStatusWarranty to
HY-26-41204 200/360 17 Aug VUA-24969 Dion Field In stock
HY-26-41205 200/360 15 Jul VUA-24767 Nelson De Villa In stock
HY-26-41206 200/360 31 Jul VUA-24045 Dion Field In stock
HY-26-41207 200/360 12 Aug VUA-24780 Dion Field In stock
Labour booked
7.7 hours against 7.9 estimated.
DateWhoCentreOrderMinutesNote
19 Aug Harinder Singh DRILL PO-26-0412 48
19 Aug Nelson De Villa WELD PO-26-0412 198 Rung join reworked — porosity on the second pass
19 Aug Harinder Singh ASSY PO-26-0412 56
19 Aug Nick Kennedy PACK PO-26-0412 30
18 Aug Harinder Singh CUT PO-26-0412 67
18 Aug Oliver Brewer INSP PO-26-0412 78