Production order PO-26-0390 Demo 1 × 150/330 · Complete
Xero connected · synced 9:14am 19 Aug 2026
← The floor Complete
Pairs
1/1
none scrapped
Hours
4.3
against 4.2h estimated
Material issued
$1,173
of $1,173 planned
Scrap off the saw
5.18kg
3 cut plans run
Off the remnant rack
9.6m
metal not bought new
Routing
Standard minutes against booked, work centre by work centre.
SeqWork centreWhat happensWhoStatusStdBookedVariance
1 CUT Cutting — 4 rails at 3300mm, 22 rungs at 424mm Harinder Singh Done 39 min 40 +3%
2 DRILL Drilling — Rail jig, headplate and pin holes Harinder Singh Done 25 min 28 +12%
3 WELD Welding — 44 rung joins, 2 headplates Nelson De Villa Done 84 min 79 -6%
4 ASSY Assembly — Nose, lugs, pins, ID plate Harinder Singh Done 32 min 38 +19%
5 INSP Inspection — Proof load and dimensional check Oliver Brewer Done 40 min 43 +8%
6 PACK Packing — Bearers, strap, wrap, label Nick Kennedy Done 29 min 28 -3%
Cutting and nesting
What has to be cut to length, and how it was nested onto bar and remnant.
ProfilePiecesCut toTotal lengthCut planYieldOff the rack
EXT-150-SR
150 Series side rail extrusion
4 3,300mm 13.20m CP-26-0303 95.6% 2 · 6.6m
EXT-NOSE
Nose / toe extrusion
2 400mm 0.80m CP-26-0305 59.3% 1 · 0.8m
EXT-RUNG-HD
Heavy duty rung — Hyway profile
22 424mm 9.33m CP-26-0304 91.6% 1 · 2.1m
Material
Required against issued, priced at what the buyer last paid.
1 short
CodeMaterialBinRequiredIssuedOn handCost
GAS-ARG Argon E-size cylinder RM-E1 0.086 ea 0.086 9.42 $8.25
WIRE-5356 5356 MIG wire 1.2mm, 7kg spool RM-E1 0.043 spool 0.043 20.76 $5.07
EXT-150-SR 150 Series side rail extrusion
4 at 3300mm
RM-A2 13.200 m 13.200 267.40 $624.36
EXT-NOSE Nose / toe extrusion
2 at 400mm
RM-B1 0.800 m 0.800 279.80 $15.56
EXT-RUNG-HD Heavy duty rung — Hyway profile
22 at 424mm
RM-B1 9.328 m 9.328 -119.30 $241.13
PLATE-ID Serial identification plate RM-D1 2.000 ea 2.000 434.26 $8.40
RIVET-4 4mm rivet, stainless, pack of 500 RM-D1 0.008 pack 0.008 12.05 $0.59
STRAP-PP 19mm poly strapping, 1000m coil RM-E1 0.012 coil 0.012 5.80 $1.03
TIMB-BEAR Timber bearer 100×50, 1.2m RM-E1 2.000 ea 2.000 247.68 $14.80
WRAP-PAL Pallet wrap 500mm × 400m RM-E1 0.050 roll 0.050 20.67 $1.08
PIN-14-S 14mm steel pin, zinc plated RM-D1 4.000 ea 4.000 423.19 $46.40
PIN-CHAIN Pin retaining chain, 300mm RM-D1 4.000 ea 4.000 725.03 $15.60
PL-GUSS-6 6mm gusset plate 1200×600 RM-C1 0.100 sheet 0.100 13.40 $15.20
PL-HP-8 8mm headplate plate 2500×1250 RM-C1 0.200 sheet 0.200 14.05 $175.20
Planned material$1,172.67
Labour booked
4.3 hours off the floor against this order.
DateWhoWork centreMinutesDoneScrapNote
19 Aug Oliver Brewer INSP 43 1
19 Aug Harinder Singh CUT 40 1
18 Aug Nick Kennedy PACK 28 1
18 Aug Harinder Singh ASSY 38 1
18 Aug Nelson De Villa WELD 79 1
18 Aug Harinder Singh DRILL 28 1
Ramps built
One serial per ramp, with the batch it came from and who signed it off.
SerialBuiltCapacityLengthBatchWelderInspectedStatus
HY-26-41182 10 Jul 4,500kg 3.3m VUA-24364 Nelson De Villa Oliver Brewer In service
HY-26-41183 26 Jun 4,500kg 3.3m VUA-24253 Dion Field Oliver Brewer In service