Hyway Hyway
Hyway Hyway
Production order PO-26-0442 Demo 2 × 125/330 · Packing
Xero connected · synced 9:14am 19 Aug 2026
← The floor Packing
Pairs
2/2
none scrapped
Hours
7.7
against 7.4h estimated
Material issued
$1,888
of $1,888 planned
Scrap off the saw
5.22kg
3 cut plans run
Off the remnant rack
9.2m
metal not bought new
Routing
Standard minutes against booked, work centre by work centre.
SeqWork centreWhat happensWhoStatusStdBookedVariance
1 CUT Cutting — 4 rails at 3300mm, 22 rungs at 374mm Harinder Singh Done 66 min 74 +12%
2 DRILL Drilling — Rail jig, headplate and pin holes Harinder Singh Done 42 min 48 +14%
3 WELD Welding — 44 rung joins, 2 headplates Dion Field Done 154 min 175 +14%
4 ASSY Assembly — Nose, lugs, pins, ID plate Harinder Singh Done 58 min 52 -10%
5 INSP Inspection — Proof load and dimensional check Oliver Brewer Done 70 min 64 -9%
6 PACK Packing — Bearers, strap, wrap, label Nick Kennedy Running 54 min 31 -43%
Cutting and nesting
What has to be cut to length, and how it was nested onto bar and remnant.
ProfilePiecesCut toTotal lengthCut planYieldOff the rack
EXT-125-SR
125 Series side rail extrusion
8 3,300mm 26.40m CP-26-0387 96.0% 2 · 6.6m
EXT-NOSE
Nose / toe extrusion
4 350mm 1.40m CP-26-0389 98.6% 1 · 1.4m
EXT-RUNG-HD
Heavy duty rung — Hyway profile
44 374mm 16.46m CP-26-0388 96.1% 1 · 1.1m
Material
Required against issued, priced at what the buyer last paid.
1 short
CodeMaterialBinRequiredIssuedOn handCost
GAS-ARG Argon E-size cylinder RM-E1 0.172 ea 0.172 9.42 $16.49
WIRE-5356 5356 MIG wire 1.2mm, 7kg spool RM-E1 0.086 spool 0.086 20.76 $10.15
EXT-125-SR 125 Series side rail extrusion
8 at 3300mm
RM-A2 26.400 m 26.400 482.50 $1,030.92
EXT-NOSE Nose / toe extrusion
4 at 350mm
RM-B1 1.400 m 1.400 279.80 $27.23
EXT-RUNG-HD Heavy duty rung — Hyway profile
44 at 374mm
RM-B1 16.456 m 16.456 -119.30 $425.39
PLATE-ID Serial identification plate RM-D1 4.000 ea 4.000 434.26 $16.80
RIVET-4 4mm rivet, stainless, pack of 500 RM-D1 0.016 pack 0.016 12.05 $1.18
STRAP-PP 19mm poly strapping, 1000m coil RM-E1 0.024 coil 0.024 5.80 $2.06
TIMB-BEAR Timber bearer 100×50, 1.2m RM-E1 4.000 ea 4.000 247.68 $29.60
WRAP-PAL Pallet wrap 500mm × 400m RM-E1 0.100 roll 0.100 20.67 $2.15
PIN-14-S 14mm steel pin, zinc plated RM-D1 4.000 ea 4.000 423.19 $46.40
PIN-CHAIN Pin retaining chain, 300mm RM-D1 4.000 ea 4.000 725.03 $15.60
PL-GUSS-6 6mm gusset plate 1200×600 RM-C1 0.200 sheet 0.200 13.40 $30.40
PL-HP-8 8mm headplate plate 2500×1250 RM-C1 0.267 sheet 0.267 14.05 $233.54
Planned material$1,887.91
Labour booked
7.4 hours off the floor against this order.
DateWhoWork centreMinutesDoneScrapNote
19 Aug Nick Kennedy PACK 31
19 Aug Oliver Brewer INSP 64 2
19 Aug Harinder Singh DRILL 48 2
18 Aug Harinder Singh ASSY 52 2
18 Aug Dion Field WELD 175 2
18 Aug Harinder Singh CUT 74 2
Ramps built
One serial per ramp, with the batch it came from and who signed it off.
SerialBuiltCapacityLengthBatchWelderInspectedStatus
HY-26-41238 14 Jul 3,000kg 3.3m VUA-24942 Nelson De Villa Oliver Brewer In stock
HY-26-41239 13 Jul 3,000kg 3.3m VUA-24914 Nelson De Villa Oliver Brewer In stock
HY-26-41240 21 Jul 3,000kg 3.3m VUA-24748 Nelson De Villa Oliver Brewer In stock
HY-26-41241 14 Jul 3,000kg 3.3m VUA-24379 Nelson De Villa Oliver Brewer In stock