Hyway Hyway
Hyway Hyway
Production order PO-26-0431 Demo 1 × L75 180 · Complete
Xero connected · synced 9:14am 19 Aug 2026
← The floor Complete
Pairs
1/1
1 scrapped
Hours
3.1
against 2.9h estimated
Material issued
$381
of $381 planned
Scrap off the saw
2.15kg
3 cut plans run
Off the remnant rack
6.9m
metal not bought new
Routing
Standard minutes against booked, work centre by work centre.
SeqWork centreWhat happensWhoStatusStdBookedVariance
1 CUT Cutting — 4 rails at 1800mm, 12 rungs at 374mm Harinder Singh Done 27 min 33 +22%
2 DRILL Drilling — Rail jig, headplate and pin holes Harinder Singh Done 18 min 17 -6%
3 WELD Welding — 24 rung joins, 2 headplates Nelson De Villa Done 51 min 53 +4%
4 ASSY Assembly — Nose, lugs, pins, ID plate Harinder Singh Done 23 min 22 -4%
5 INSP Inspection — Dimensional check and weld inspection Oliver Brewer Done 32 min 33 +3%
6 PACK Packing — Bearers, strap, wrap, label Nick Kennedy Done 20 min 22 +10%
Cutting and nesting
What has to be cut to length, and how it was nested onto bar and remnant.
ProfilePiecesCut toTotal lengthCut planYieldOff the rack
EXT-L75-SR
L75 side rail extrusion
4 1,800mm 7.20m CP-26-0372 93.7% 3 · 5.4m
EXT-NOSE
Nose / toe extrusion
2 350mm 0.70m CP-26-0374 53.8% 1 · 0.7m
EXT-RUNG-LT
Light rung — Hyway profile
12 374mm 4.49m CP-26-0373 97.0% 1 · 0.8m
Material
Required against issued, priced at what the buyer last paid.
CodeMaterialBinRequiredIssuedOn handCost
GAS-ARG Argon E-size cylinder RM-E1 0.064 ea 0.064 9.42 $6.17
WIRE-5356 5356 MIG wire 1.2mm, 7kg spool RM-E1 0.032 spool 0.032 20.76 $3.80
EXT-L75-SR L75 side rail extrusion
4 at 1800mm
RM-A3 7.200 m 7.200 460.10 $165.24
EXT-NOSE Nose / toe extrusion
2 at 350mm
RM-B1 0.700 m 0.700 279.80 $13.62
EXT-RUNG-LT Light rung — Hyway profile
12 at 374mm
RM-B1 4.488 m 4.488 547.70 $79.44
PLATE-ID Serial identification plate RM-D1 2.000 ea 2.000 434.26 $8.40
RIVET-4 4mm rivet, stainless, pack of 500 RM-D1 0.008 pack 0.008 12.05 $0.59
STRAP-PP 19mm poly strapping, 1000m coil RM-E1 0.012 coil 0.012 5.80 $1.03
TIMB-BEAR Timber bearer 100×50, 1.2m RM-E1 2.000 ea 2.000 247.68 $14.80
WRAP-PAL Pallet wrap 500mm × 400m RM-E1 0.050 roll 0.050 20.67 $1.08
PIN-10-S 10mm steel pin, zinc plated RM-D1 2.000 ea 2.000 443.47 $16.80
PIN-CHAIN Pin retaining chain, 300mm RM-D1 2.000 ea 2.000 725.03 $7.80
PL-HP-6 6mm headplate plate 2500×1250 RM-C1 0.095 sheet 0.095 20.23 $62.55
Planned material$381.32
Labour booked
3.0 hours off the floor against this order.
DateWhoWork centreMinutesDoneScrapNote
19 Aug Nick Kennedy PACK 22 1
19 Aug Oliver Brewer INSP 33 1
19 Aug Harinder Singh ASSY 22 1
19 Aug Harinder Singh DRILL 17 1
18 Aug Nelson De Villa WELD 53 1
18 Aug Harinder Singh CUT 33 1
Ramps built
One serial per ramp, with the batch it came from and who signed it off.
SerialBuiltCapacityLengthBatchWelderInspectedStatus
HY-26-41226 9 Jul 1,700kg 1.8m VUA-24547 Dion Field Oliver Brewer In service
HY-26-41227 29 Jun 1,700kg 1.8m VUA-24369 Dion Field Oliver Brewer In service