Hyway Hyway
Hyway Hyway
Production order PO-26-0411 Demo 1 × 175/360 · Packing
Xero connected · synced 9:14am 19 Aug 2026
← The floor Packing
Pairs
1/1
none scrapped
Hours
4.5
against 4.4h estimated
Material issued
$1,473
of $1,473 planned
Scrap off the saw
0.00kg
0 cut plans run
Off the remnant rack
0.0m
metal not bought new
Routing
Standard minutes against booked, work centre by work centre.
SeqWork centreWhat happensWhoStatusStdBookedVariance
1 CUT Cutting — 4 rails at 3600mm, 26 rungs at 474mm Harinder Singh Done 41 min 45 +10%
2 DRILL Drilling — Rail jig, headplate and pin holes Harinder Singh Done 27 min 33 +22%
3 WELD Welding — 52 rung joins, 2 headplates Nelson De Villa Done 93 min 105 +13%
4 ASSY Assembly — Nose, lugs, pins, ID plate Harinder Singh Done 34 min 31 -9%
5 INSP Inspection — Proof load and dimensional check Oliver Brewer Done 40 min 37 -8%
6 PACK Packing — Bearers, strap, wrap, label Nick Kennedy Running 30 min 19 -37%
Cutting and nesting
What has to be cut to length, and how it was nested onto bar and remnant.
ProfilePiecesCut toTotal lengthCut planYieldOff the rack
EXT-175-SR
175 Series side rail extrusion
4 3,600mm 14.40m Not run
EXT-NOSE
Nose / toe extrusion
2 450mm 0.90m Not run
EXT-RUNG-HD
Heavy duty rung — Hyway profile
26 474mm 12.32m Not run
Running the plan looks at what is on the remnant rack before it opens a new mill length, takes the shortest piece that will do the job, and puts anything over 600mm back on the rack as a new remnant.
Material
Required against issued, priced at what the buyer last paid.
2 short
CodeMaterialBinRequiredIssuedOn handCost
GAS-ARG Argon E-size cylinder RM-E1 0.095 ea 0.095 9.42 $9.08
WIRE-5356 5356 MIG wire 1.2mm, 7kg spool RM-E1 0.047 spool 0.047 20.76 $5.58
EXT-175-SR 175 Series side rail extrusion
4 at 3600mm
RM-A1 14.400 m 14.400 -61.10 $799.92
EXT-NOSE Nose / toe extrusion
2 at 450mm
RM-B1 0.900 m 0.900 279.80 $17.51
EXT-RUNG-HD Heavy duty rung — Hyway profile
26 at 474mm
RM-B1 12.324 m 12.324 -119.30 $318.58
PLATE-ID Serial identification plate RM-D1 2.000 ea 2.000 434.26 $8.40
RIVET-4 4mm rivet, stainless, pack of 500 RM-D1 0.008 pack 0.008 12.05 $0.59
STRAP-PP 19mm poly strapping, 1000m coil RM-E1 0.012 coil 0.012 5.80 $1.03
TIMB-BEAR Timber bearer 100×50, 1.2m RM-E1 2.000 ea 2.000 247.68 $14.80
WRAP-PAL Pallet wrap 500mm × 400m RM-E1 0.050 roll 0.050 20.67 $1.08
PIN-14-S 14mm steel pin, zinc plated RM-D1 4.000 ea 4.000 423.19 $46.40
PIN-CHAIN Pin retaining chain, 300mm RM-D1 4.000 ea 4.000 725.03 $15.60
PL-GUSS-6 6mm gusset plate 1200×600 RM-C1 0.100 sheet 0.100 13.40 $15.20
PL-HP-10 10mm headplate plate 2500×1250 RM-C1 0.200 sheet 0.200 2.05 $219.00
Planned material$1,472.77
Labour booked
4.5 hours off the floor against this order.
DateWhoWork centreMinutesDoneScrapNote
19 Aug Nick Kennedy PACK 19
19 Aug Harinder Singh ASSY 31 1
18 Aug Oliver Brewer INSP 37 1
18 Aug Nelson De Villa WELD 105 1
18 Aug Harinder Singh DRILL 33 1
18 Aug Harinder Singh CUT 45 1
Ramps built
One serial per ramp, with the batch it came from and who signed it off.
SerialBuiltCapacityLengthBatchWelderInspectedStatus
HY-26-41202 10 Jul 6,000kg 3.6m VUA-24058 Nelson De Villa Oliver Brewer In stock
HY-26-41203 31 Jul 6,000kg 3.6m VUA-24718 Nelson De Villa Oliver Brewer In stock