Hyway Hyway
Hyway Hyway
Job HJ-2026-0145 Demo Wairarapa Contracting · Custom ramps — Hitachi ZX55U-5 excavator
Xero connected · synced 9:14am 19 Aug 2026
← Jobs Packing Custom
Quote Q-2026-0427
Contract value
$4,230
incl $450 of variations
Quoted cost
$2,158
$1,338 material · 8.4h
Actual so far
$2,027
$1,590 material · 4.5h
Margin
49.0%
on the quote
Invoiced
$3,335
$1,890 received
The specification
Captured on the enquiry and unchanged since. Variations sit alongside it, not over it.
Hitachi ZX55U-5 excavator
All-up weight5,100kg
Axle / track load2,750kg
Track width1,990mm
Deck height960mm
Gradient30%
AttachmentSteel pins
The ramps
6,000kg
rated per pair
3.2m
length
500mm
rung width
175
profile
ID welding, Wide track
Production
What is being built against this job.
OrderModelQtyStageHoursMaterialDue
PO-26-0411 175/360
6000kg Aluminium Ramps at 3.6m
1/1 Packing 4.5 / 4.4 $1,590 / $1,473 9 Sep
Variations
Priced and approved separately. The original quotation and specification stay as they were.
VariationWhat changedRaised byStatusValue
VO-2026-009 Change from steel pins to welded lugs at the customer's request Nick Harrison
12 Aug
Approved $450
Drawings and documents
The workshop only ever sees the current revision.
DocumentKindRevStatusFiled byWhen
Signed drawing approval Approval A Current Leigh Sharland 3 Aug, 14:40
HD-0145 Rev B — general arrangement Drawing B Current Oliver Brewer 28 Jul, 09:20
HD-0145 Rev A — general arrangement Drawing A Superseded Oliver Brewer 17 Jul, 08:20
Site photos — deck height and attachment Photo A Current Nick Harrison 29 Jul, 15:10
Safe use and inspection booklet Safety 2026-1 Current Leigh Sharland 14 Aug, 10:00
Machine specification sheet — customer supplied Specification A Current Nick Harrison 15 Jul, 11:05
Ramps built on this job
Serial numbers stay against the job and the customer for the life of the ramp.
SerialModelBuiltBatchWelderStatusWarranty to
HY-26-41202 175/360 10 Jul VUA-24058 Nelson De Villa In stock
HY-26-41203 175/360 31 Jul VUA-24718 Nelson De Villa In stock
Labour booked
4.5 hours against 4.4 estimated.
DateWhoCentreOrderMinutesNote
19 Aug Harinder Singh ASSY PO-26-0411 31
19 Aug Nick Kennedy PACK PO-26-0411 19
18 Aug Harinder Singh CUT PO-26-0411 45
18 Aug Harinder Singh DRILL PO-26-0411 33
18 Aug Nelson De Villa WELD PO-26-0411 105
18 Aug Oliver Brewer INSP PO-26-0411 37