Hyway Hyway
Hyway Hyway
Production order PO-26-0399 Demo 2 × 150/330 · Packing
Xero connected · synced 9:14am 19 Aug 2026
← The floor Packing
Pairs
2/2
1 scrapped
Hours
6.7
against 7.4h estimated
Material issued
$2,345
of $2,345 planned
Scrap off the saw
2.79kg
3 cut plans run
Off the remnant rack
3.3m
metal not bought new
Routing
Standard minutes against booked, work centre by work centre.
SeqWork centreWhat happensWhoStatusStdBookedVariance
1 CUT Cutting — 4 rails at 3300mm, 22 rungs at 424mm Harinder Singh Done 66 min 71 +8%
2 DRILL Drilling — Rail jig, headplate and pin holes Harinder Singh Done 42 min 44 +5%
3 WELD Welding — 44 rung joins, 2 headplates Nelson De Villa Done 154 min 162 +5%
4 ASSY Assembly — Nose, lugs, pins, ID plate Harinder Singh Done 58 min 65 +12%
5 INSP Inspection — Proof load and dimensional check Oliver Brewer Done 70 min 65 -7%
6 PACK Packing — Bearers, strap, wrap, label Nick Kennedy Running 54 min 34 -37%
Cutting and nesting
What has to be cut to length, and how it was nested onto bar and remnant.
ProfilePiecesCut toTotal lengthCut planYieldOff the rack
EXT-150-SR
150 Series side rail extrusion
8 3,300mm 26.40m CP-26-0318 99.8% 0 · 0.0m
EXT-NOSE
Nose / toe extrusion
4 400mm 1.60m CP-26-0320 98.8% 1 · 1.6m
EXT-RUNG-HD
Heavy duty rung — Hyway profile
44 424mm 18.66m CP-26-0319 93.4% 1 · 1.7m
Material
Required against issued, priced at what the buyer last paid.
1 short
CodeMaterialBinRequiredIssuedOn handCost
GAS-ARG Argon E-size cylinder RM-E1 0.172 ea 0.172 9.42 $16.49
WIRE-5356 5356 MIG wire 1.2mm, 7kg spool RM-E1 0.086 spool 0.086 20.76 $10.15
EXT-150-SR 150 Series side rail extrusion
8 at 3300mm
RM-A2 26.400 m 26.400 267.40 $1,248.72
EXT-NOSE Nose / toe extrusion
4 at 400mm
RM-B1 1.600 m 1.600 279.80 $31.12
EXT-RUNG-HD Heavy duty rung — Hyway profile
44 at 424mm
RM-B1 18.656 m 18.656 -119.30 $482.26
PLATE-ID Serial identification plate RM-D1 4.000 ea 4.000 434.26 $16.80
RIVET-4 4mm rivet, stainless, pack of 500 RM-D1 0.016 pack 0.016 12.05 $1.18
STRAP-PP 19mm poly strapping, 1000m coil RM-E1 0.024 coil 0.024 5.80 $2.06
TIMB-BEAR Timber bearer 100×50, 1.2m RM-E1 4.000 ea 4.000 247.68 $29.60
WRAP-PAL Pallet wrap 500mm × 400m RM-E1 0.100 roll 0.100 20.67 $2.15
PIN-14-S 14mm steel pin, zinc plated RM-D1 8.000 ea 8.000 423.19 $92.80
PIN-CHAIN Pin retaining chain, 300mm RM-D1 8.000 ea 8.000 725.03 $31.20
PL-GUSS-6 6mm gusset plate 1200×600 RM-C1 0.200 sheet 0.200 13.40 $30.40
PL-HP-8 8mm headplate plate 2500×1250 RM-C1 0.400 sheet 0.400 14.05 $350.40
Planned material$2,345.33
Labour booked
7.4 hours off the floor against this order.
DateWhoWork centreMinutesDoneScrapNote
19 Aug Oliver Brewer INSP 65 2
19 Aug Harinder Singh DRILL 44 2
18 Aug Nick Kennedy PACK 34
18 Aug Harinder Singh ASSY 65 2
18 Aug Nelson De Villa WELD 162 2 Rework ·
18 Aug Harinder Singh CUT 71 2
Ramps built
One serial per ramp, with the batch it came from and who signed it off.
SerialBuiltCapacityLengthBatchWelderInspectedStatus
HY-26-41188 12 Aug 4,500kg 3.3m VUA-24140 Nelson De Villa Oliver Brewer In stock
HY-26-41189 25 Jun 4,500kg 3.3m VUA-24179 Dion Field Oliver Brewer In stock
HY-26-41190 31 Jul 4,500kg 3.3m VUA-24252 Nelson De Villa Oliver Brewer In stock
HY-26-41191 8 Jul 4,500kg 3.3m VUA-24243 Dion Field Oliver Brewer In stock