Production order PO-26-0433 Demo 1 × L75 240 · Complete
Xero connected · synced 9:14am 19 Aug 2026
← The floor Complete
Pairs
1/1
none scrapped
Hours
3.6
against 3.0h estimated
Material issued
$464
of $464 planned
Scrap off the saw
0.36kg
3 cut plans run
Off the remnant rack
10.1m
metal not bought new
Routing
Standard minutes against booked, work centre by work centre.
SeqWork centreWhat happensWhoStatusStdBookedVariance
1 CUT Cutting — 4 rails at 2400mm, 16 rungs at 374mm Harinder Singh Done 29 min 29 +0%
2 DRILL Drilling — Rail jig, headplate and pin holes Harinder Singh Done 19 min 21 +11%
3 WELD Welding — 32 rung joins, 2 headplates Nelson De Villa Done 57 min 53 -7%
4 ASSY Assembly — Nose, lugs, pins, ID plate Harinder Singh Done 24 min 24 +0%
5 INSP Inspection — Dimensional check and weld inspection Oliver Brewer Done 32 min 35 +9%
6 PACK Packing — Bearers, strap, wrap, label Nick Kennedy Done 21 min 25 +19%
Cutting and nesting
What has to be cut to length, and how it was nested onto bar and remnant.
ProfilePiecesCut toTotal lengthCut planYieldOff the rack
EXT-L75-SR
L75 side rail extrusion
4 2,400mm 9.60m CP-26-0378 99.8% 1 · 4.8m
EXT-NOSE
Nose / toe extrusion
2 350mm 0.70m CP-26-0380 98.6% 1 · 0.7m
EXT-RUNG-LT
Light rung — Hyway profile
16 374mm 5.98m CP-26-0379 96.3% 1 · 4.5m
Material
Required against issued, priced at what the buyer last paid.
CodeMaterialBinRequiredIssuedOn handCost
GAS-ARG Argon E-size cylinder RM-E1 0.073 ea 0.073 9.42 $7.01
WIRE-5356 5356 MIG wire 1.2mm, 7kg spool RM-E1 0.037 spool 0.037 20.76 $4.31
EXT-L75-SR L75 side rail extrusion
4 at 2400mm
RM-A3 9.600 m 9.600 460.10 $220.32
EXT-NOSE Nose / toe extrusion
2 at 350mm
RM-B1 0.700 m 0.700 279.80 $13.62
EXT-RUNG-LT Light rung — Hyway profile
16 at 374mm
RM-B1 5.984 m 5.984 547.70 $105.92
PLATE-ID Serial identification plate RM-D1 2.000 ea 2.000 434.26 $8.40
RIVET-4 4mm rivet, stainless, pack of 500 RM-D1 0.008 pack 0.008 12.05 $0.59
STRAP-PP 19mm poly strapping, 1000m coil RM-E1 0.012 coil 0.012 5.80 $1.03
TIMB-BEAR Timber bearer 100×50, 1.2m RM-E1 2.000 ea 2.000 247.68 $14.80
WRAP-PAL Pallet wrap 500mm × 400m RM-E1 0.050 roll 0.050 20.67 $1.08
PIN-10-S 10mm steel pin, zinc plated RM-D1 2.000 ea 2.000 443.47 $16.80
PIN-CHAIN Pin retaining chain, 300mm RM-D1 2.000 ea 2.000 725.03 $7.80
PL-HP-6 6mm headplate plate 2500×1250 RM-C1 0.095 sheet 0.095 20.23 $62.55
Planned material$464.23
Labour booked
3.1 hours off the floor against this order.
DateWhoWork centreMinutesDoneScrapNote
19 Aug Nick Kennedy PACK 25 1
19 Aug Oliver Brewer INSP 35 1
19 Aug Harinder Singh ASSY 24 1
19 Aug Nelson De Villa WELD 53 1 Rework ·
19 Aug Harinder Singh DRILL 21 1
19 Aug Harinder Singh CUT 29 1
Ramps built
One serial per ramp, with the batch it came from and who signed it off.
SerialBuiltCapacityLengthBatchWelderInspectedStatus
HY-26-41230 24 Jul 1,200kg 2.4m VUA-24231 Dion Field Oliver Brewer In service
HY-26-41231 26 Jun 1,200kg 2.4m VUA-24251 Dion Field Oliver Brewer In service