Hyway Hyway
Hyway Hyway
Production order PO-26-0432 Demo 1 × L100 210 · Complete
Xero connected · synced 9:14am 19 Aug 2026
← The floor Complete
Pairs
1/1
none scrapped
Hours
2.8
against 2.9h estimated
Material issued
$587
of $587 planned
Scrap off the saw
0.53kg
3 cut plans run
Off the remnant rack
9.7m
metal not bought new
Routing
Standard minutes against booked, work centre by work centre.
SeqWork centreWhat happensWhoStatusStdBookedVariance
1 CUT Cutting — 4 rails at 2100mm, 14 rungs at 424mm Harinder Singh Done 28 min 25 -11%
2 DRILL Drilling — Rail jig, headplate and pin holes Harinder Singh Done 18 min 20 +11%
3 WELD Welding — 28 rung joins, 2 headplates Dion Field Done 54 min 61 +13%
4 ASSY Assembly — Nose, lugs, pins, ID plate Harinder Singh Done 24 min 24 +0%
5 INSP Inspection — Dimensional check and weld inspection Oliver Brewer Done 32 min 37 +16%
6 PACK Packing — Bearers, strap, wrap, label Nick Kennedy Done 20 min 18 -10%
Cutting and nesting
What has to be cut to length, and how it was nested onto bar and remnant.
ProfilePiecesCut toTotal lengthCut planYieldOff the rack
EXT-L100-SR
L100 side rail extrusion
4 2,100mm 8.40m CP-26-0375 98.5% 2 · 6.3m
EXT-NOSE
Nose / toe extrusion
2 400mm 0.80m CP-26-0377 98.8% 0 · 0.0m
EXT-RUNG-LT
Light rung — Hyway profile
14 424mm 5.94m CP-26-0376 98.1% 1 · 3.4m
Material
Required against issued, priced at what the buyer last paid.
CodeMaterialBinRequiredIssuedOn handCost
GAS-ARG Argon E-size cylinder RM-E1 0.069 ea 0.069 9.42 $6.59
WIRE-5356 5356 MIG wire 1.2mm, 7kg spool RM-E1 0.034 spool 0.034 20.76 $4.05
EXT-L100-SR L100 side rail extrusion
4 at 2100mm
RM-A3 8.400 m 8.400 290.80 $258.72
EXT-NOSE Nose / toe extrusion
2 at 400mm
RM-B1 0.800 m 0.800 279.80 $15.56
EXT-RUNG-LT Light rung — Hyway profile
14 at 424mm
RM-B1 5.936 m 5.936 547.70 $105.07
PLATE-ID Serial identification plate RM-D1 2.000 ea 2.000 434.26 $8.40
RIVET-4 4mm rivet, stainless, pack of 500 RM-D1 0.008 pack 0.008 12.05 $0.59
STRAP-PP 19mm poly strapping, 1000m coil RM-E1 0.012 coil 0.012 5.80 $1.03
TIMB-BEAR Timber bearer 100×50, 1.2m RM-E1 2.000 ea 2.000 247.68 $14.80
WRAP-PAL Pallet wrap 500mm × 400m RM-E1 0.050 roll 0.050 20.67 $1.08
PIN-14-S 14mm steel pin, zinc plated RM-D1 2.000 ea 2.000 423.19 $23.20
PIN-CHAIN Pin retaining chain, 300mm RM-D1 2.000 ea 2.000 725.03 $7.80
PL-GUSS-6 6mm gusset plate 1200×600 RM-C1 0.100 sheet 0.100 13.40 $15.20
PL-HP-8 8mm headplate plate 2500×1250 RM-C1 0.143 sheet 0.143 14.05 $125.18
Planned material$587.27
Labour booked
3.1 hours off the floor against this order.
DateWhoWork centreMinutesDoneScrapNote
19 Aug Nick Kennedy PACK 18 1
19 Aug Oliver Brewer INSP 37 1
19 Aug Dion Field WELD 61 1
18 Aug Harinder Singh ASSY 24 1
18 Aug Harinder Singh DRILL 20 1
18 Aug Harinder Singh CUT 25 1
Ramps built
One serial per ramp, with the batch it came from and who signed it off.
SerialBuiltCapacityLengthBatchWelderInspectedStatus
HY-26-41228 17 Jul 2,500kg 2.1m VUA-24504 Nelson De Villa Oliver Brewer In service
HY-26-41229 4 Aug 2,500kg 2.1m VUA-24890 Dion Field Oliver Brewer In service