125/330
3000kg Aluminium Ramps at 3.3m
On the rack
6
pairs in FG-1
Free to promise
6
0 allocated
List ex GST
$2,475
$2,846 incl GST
Standard cost
$1,284
material and labour
Margin
48.1%
at list
Built to date
8
ramps on the register
Bill of materials
Per pair. Every production order for this model is raised from these lines.
| Code | Material | Qty per pair | Cut to | Pieces | Cost | Note |
|---|---|---|---|---|---|---|
| EXT-125-SR | 125 Series side rail extrusion | 13.2000 m | 3,300mm | 4 | $515.46 | Side rails — 2 per ramp |
| EXT-RUNG-HD | Heavy duty rung — Hyway profile | 8.2280 m | 374mm | 22 | $212.69 | 11 rungs per ramp at 320mm centres |
| EXT-NOSE | Nose / toe extrusion | 0.7000 m | 350mm | 2 | $13.62 | Toe nose |
| PL-HP-8 | 8mm headplate plate 2500×1250 | 0.1333 sheet | — | 2 | $116.77 | Headplates — 15 per sheet |
| PL-GUSS-6 | 6mm gusset plate 1200×600 | 0.1000 sheet | — | 4 | $15.20 | Headplate gussets |
| PIN-14-S | 14mm steel pin, zinc plated | 2.0000 ea | — | 2 | $23.20 | Supplied with the ramps |
| PIN-CHAIN | Pin retaining chain, 300mm | 2.0000 ea | — | — | $7.80 | |
| WIRE-5356 | 5356 MIG wire 1.2mm, 7kg spool | 0.0430 spool | — | — | $5.07 | 7.2m of weld |
| GAS-ARG | Argon E-size cylinder | 0.0859 ea | — | — | $8.25 | |
| PLATE-ID | Serial identification plate | 2.0000 ea | — | — | $8.40 | Serial plate, one per ramp |
| RIVET-4 | 4mm rivet, stainless, pack of 500 | 0.0080 pack | — | — | $0.59 | |
| STRAP-PP | 19mm poly strapping, 1000m coil | 0.0120 coil | — | — | $1.03 | |
| TIMB-BEAR | Timber bearer 100×50, 1.2m | 2.0000 ea | — | — | $14.80 | |
| WRAP-PAL | Pallet wrap 500mm × 400m | 0.0500 roll | — | — | $1.08 | |
| Material per pair | $943.96 | |||||
Routing
Setup once per batch, run time per pair.
| Seq | Work centre | What happens | Setup | Run per pair |
|---|---|---|---|---|
| 1 | Cutting | 4 rails at 3300mm, 22 rungs at 374mm | 12 min | 27 min |
| 2 | Drilling | Rail jig, headplate and pin holes | 8 min | 17 min |
| 3 | Welding | 44 rung joins, 2 headplates | 14 min | 70 min |
| 4 | Assembly | Nose, lugs, pins, ID plate | 6 min | 26 min |
| 5 | Inspection | Proof load and dimensional check | 10 min | 30 min |
| 6 | Packing | Bearers, strap, wrap, label | 4 min | 25 min |
Being built now
| Order | Came from | Qty | Stage | Due |
|---|---|---|---|---|
| PO-26-0442 | Sales order HJ-2026-0147 | 2/2 | Packing | 3 Aug |
| PO-26-0438 | Sales order HJ-2026-0134 | 0/2 | Planned | 6 Aug |
Recent builds
The last 8 of this model off the floor.
| Serial | Built | Batch | Status | Warranty to |
|---|---|---|---|---|
| HY-26-41240 | 21 Jul | VUA-24748 | In stock | — |
| HY-26-41238 | 14 Jul | VUA-24942 | In stock | — |
| HY-26-41241 | 14 Jul | VUA-24379 | In stock | — |
| HY-26-41239 | 13 Jul | VUA-24914 | In stock | — |
| HY-25-41348 | 6 Mar | VUA-22237 | In service | 14 Jan |
| HY-26-41370 | 25 Dec | VUA-23350 | In service | 11 Mar |
| HY-25-41358 | 19 Aug | VUA-23455 | In service | 27 Mar |
| HY-25-41357 | 6 May | VUA-23018 | In service | 21 Jun |