Hyway Hyway
Hyway Hyway
Production order PO-26-0434 Demo 1 × L75 210 · Complete
Xero connected · synced 9:14am 19 Aug 2026
← The floor Complete
Pairs
1/1
none scrapped
Hours
2.9
against 2.9h estimated
Material issued
$423
of $423 planned
Scrap off the saw
1.48kg
3 cut plans run
Off the remnant rack
8.1m
metal not bought new
Routing
Standard minutes against booked, work centre by work centre.
SeqWork centreWhat happensWhoStatusStdBookedVariance
1 CUT Cutting — 4 rails at 2100mm, 14 rungs at 374mm Harinder Singh Done 28 min 30 +7%
2 DRILL Drilling — Rail jig, headplate and pin holes Harinder Singh Done 18 min 22 +22%
3 WELD Welding — 28 rung joins, 2 headplates Dion Field Done 54 min 60 +11%
4 ASSY Assembly — Nose, lugs, pins, ID plate Harinder Singh Done 24 min 25 +4%
5 INSP Inspection — Dimensional check and weld inspection Oliver Brewer Done 32 min 30 -6%
6 PACK Packing — Bearers, strap, wrap, label Nick Kennedy Done 20 min 23 +15%
Cutting and nesting
What has to be cut to length, and how it was nested onto bar and remnant.
ProfilePiecesCut toTotal lengthCut planYieldOff the rack
EXT-L75-SR
L75 side rail extrusion
4 2,100mm 8.40m CP-26-0381 95.7% 1 · 2.1m
EXT-NOSE
Nose / toe extrusion
2 350mm 0.70m CP-26-0383 98.6% 1 · 0.7m
EXT-RUNG-LT
Light rung — Hyway profile
14 374mm 5.24m CP-26-0382 91.0% 1 · 5.3m
Material
Required against issued, priced at what the buyer last paid.
CodeMaterialBinRequiredIssuedOn handCost
GAS-ARG Argon E-size cylinder RM-E1 0.069 ea 0.069 9.42 $6.59
WIRE-5356 5356 MIG wire 1.2mm, 7kg spool RM-E1 0.034 spool 0.034 20.76 $4.05
EXT-L75-SR L75 side rail extrusion
4 at 2100mm
RM-A3 8.400 m 8.400 460.10 $192.78
EXT-NOSE Nose / toe extrusion
2 at 350mm
RM-B1 0.700 m 0.700 279.80 $13.62
EXT-RUNG-LT Light rung — Hyway profile
14 at 374mm
RM-B1 5.236 m 5.236 547.70 $92.68
PLATE-ID Serial identification plate RM-D1 2.000 ea 2.000 434.26 $8.40
RIVET-4 4mm rivet, stainless, pack of 500 RM-D1 0.008 pack 0.008 12.05 $0.59
STRAP-PP 19mm poly strapping, 1000m coil RM-E1 0.012 coil 0.012 5.80 $1.03
TIMB-BEAR Timber bearer 100×50, 1.2m RM-E1 2.000 ea 2.000 247.68 $14.80
WRAP-PAL Pallet wrap 500mm × 400m RM-E1 0.050 roll 0.050 20.67 $1.08
PIN-10-S 10mm steel pin, zinc plated RM-D1 2.000 ea 2.000 443.47 $16.80
PIN-CHAIN Pin retaining chain, 300mm RM-D1 2.000 ea 2.000 725.03 $7.80
PL-HP-6 6mm headplate plate 2500×1250 RM-C1 0.095 sheet 0.095 20.23 $62.55
Planned material$422.77
Labour booked
3.2 hours off the floor against this order.
DateWhoWork centreMinutesDoneScrapNote
19 Aug Nick Kennedy PACK 23 1
19 Aug Harinder Singh ASSY 25 1
19 Aug Dion Field WELD 60 1
19 Aug Harinder Singh DRILL 22 1
18 Aug Oliver Brewer INSP 30 1
18 Aug Harinder Singh CUT 30 1
Ramps built
One serial per ramp, with the batch it came from and who signed it off.
SerialBuiltCapacityLengthBatchWelderInspectedStatus
HY-26-41232 17 Aug 1,400kg 2.1m VUA-24922 Nelson De Villa Oliver Brewer In service
HY-26-41233 17 Aug 1,400kg 2.1m VUA-24892 Dion Field Oliver Brewer In service