Production order PO-26-0426 Demo 1 × 200/360 · Packing
Xero connected · synced 9:14am 19 Aug 2026
← The floor Packing
Pairs
1/1
none scrapped
Hours
3.8
against 4.4h estimated
Material issued
$1,627
of $1,627 planned
Scrap off the saw
2.26kg
3 cut plans run
Off the remnant rack
2.1m
metal not bought new
Routing
Standard minutes against booked, work centre by work centre.
SeqWork centreWhat happensWhoStatusStdBookedVariance
1 CUT Cutting — 4 rails at 3600mm, 26 rungs at 524mm Harinder Singh Done 41 min 47 +15%
2 DRILL Drilling — Rail jig, headplate and pin holes Harinder Singh Done 27 min 33 +22%
3 WELD Welding — 52 rung joins, 2 headplates Dion Field Done 93 min 109 +17%
4 ASSY Assembly — Nose, lugs, pins, ID plate Harinder Singh Done 34 min 30 -12%
5 INSP Inspection — Proof load and dimensional check Oliver Brewer Done 40 min 39 -3%
6 PACK Packing — Bearers, strap, wrap, label Nick Kennedy Running 30 min 10 -67%
Cutting and nesting
What has to be cut to length, and how it was nested onto bar and remnant.
ProfilePiecesCut toTotal lengthCut planYieldOff the rack
EXT-200-SR
200 Series side rail extrusion
4 3,600mm 14.40m CP-26-0357 99.0% 0 · 0.0m
EXT-NOSE
Nose / toe extrusion
2 500mm 1.00m CP-26-0359 99.0% 1 · 1.0m
EXT-RUNG-HD
Heavy duty rung — Hyway profile
26 524mm 13.62m CP-26-0358 94.9% 1 · 1.1m
Material
Required against issued, priced at what the buyer last paid.
1 short
CodeMaterialBinRequiredIssuedOn handCost
GAS-ARG Argon E-size cylinder RM-E1 0.095 ea 0.095 9.42 $9.08
WIRE-5356 5356 MIG wire 1.2mm, 7kg spool RM-E1 0.047 spool 0.047 20.76 $5.58
EXT-200-SR 200 Series side rail extrusion
4 at 3600mm
RM-A1 14.400 m 14.400 284.30 $918.72
EXT-NOSE Nose / toe extrusion
2 at 500mm
RM-B1 1.000 m 1.000 279.80 $19.45
EXT-RUNG-HD Heavy duty rung — Hyway profile
26 at 524mm
RM-B1 13.624 m 13.624 -119.30 $352.18
PLATE-ID Serial identification plate RM-D1 2.000 ea 2.000 434.26 $8.40
RIVET-4 4mm rivet, stainless, pack of 500 RM-D1 0.008 pack 0.008 12.05 $0.59
STRAP-PP 19mm poly strapping, 1000m coil RM-E1 0.012 coil 0.012 5.80 $1.03
TIMB-BEAR Timber bearer 100×50, 1.2m RM-E1 2.000 ea 2.000 247.68 $14.80
WRAP-PAL Pallet wrap 500mm × 400m RM-E1 0.050 roll 0.050 20.67 $1.08
PIN-14-S 14mm steel pin, zinc plated RM-D1 4.000 ea 4.000 423.19 $46.40
PIN-CHAIN Pin retaining chain, 300mm RM-D1 4.000 ea 4.000 725.03 $15.60
PL-GUSS-6 6mm gusset plate 1200×600 RM-C1 0.100 sheet 0.100 13.40 $15.20
PL-HP-10 10mm headplate plate 2500×1250 RM-C1 0.200 sheet 0.200 2.05 $219.00
Planned material$1,627.11
Labour booked
4.5 hours off the floor against this order.
DateWhoWork centreMinutesDoneScrapNote
19 Aug Nick Kennedy PACK 10
19 Aug Harinder Singh ASSY 30 1
19 Aug Dion Field WELD 109 1
19 Aug Harinder Singh DRILL 33 1
19 Aug Harinder Singh CUT 47 1
18 Aug Oliver Brewer INSP 39 1
Ramps built
One serial per ramp, with the batch it came from and who signed it off.
SerialBuiltCapacityLengthBatchWelderInspectedStatus
HY-26-41216 14 Aug 7,500kg 3.6m VUA-24909 Dion Field Oliver Brewer In stock
HY-26-41217 18 Aug 7,500kg 3.6m VUA-24645 Dion Field Oliver Brewer In stock