L100 300
1700kg Aluminium Ramps at 3m
On the rack
4
pairs in FG-2
Free to promise
4
0 allocated
List ex GST
$1,875
$2,156 incl GST
Standard cost
$984
material and labour
Margin
47.5%
at list
Built to date
9
ramps on the register
Bill of materials
Per pair. Every production order for this model is raised from these lines.
| Code | Material | Qty per pair | Cut to | Pieces | Cost | Note |
|---|---|---|---|---|---|---|
| EXT-L100-SR | L100 side rail extrusion | 12.0000 m | 3,000mm | 4 | $369.60 | Side rails — 2 per ramp |
| EXT-RUNG-LT | Light rung — Hyway profile | 8.4800 m | 424mm | 20 | $150.10 | 10 rungs per ramp at 330mm centres |
| EXT-NOSE | Nose / toe extrusion | 0.8000 m | 400mm | 2 | $15.56 | Toe nose |
| PL-HP-8 | 8mm headplate plate 2500×1250 | 0.1429 sheet | — | 2 | $125.18 | Headplates — 14 per sheet |
| PL-GUSS-6 | 6mm gusset plate 1200×600 | 0.1000 sheet | — | 4 | $15.20 | Headplate gussets |
| PIN-14-S | 14mm steel pin, zinc plated | 2.0000 ea | — | 2 | $23.20 | Supplied with the ramps |
| PIN-CHAIN | Pin retaining chain, 300mm | 2.0000 ea | — | — | $7.80 | |
| WIRE-5356 | 5356 MIG wire 1.2mm, 7kg spool | 0.0408 spool | — | — | $4.81 | 6.8m of weld |
| GAS-ARG | Argon E-size cylinder | 0.0816 ea | — | — | $7.83 | |
| PLATE-ID | Serial identification plate | 2.0000 ea | — | — | $8.40 | Serial plate, one per ramp |
| RIVET-4 | 4mm rivet, stainless, pack of 500 | 0.0080 pack | — | — | $0.59 | |
| STRAP-PP | 19mm poly strapping, 1000m coil | 0.0120 coil | — | — | $1.03 | |
| TIMB-BEAR | Timber bearer 100×50, 1.2m | 2.0000 ea | — | — | $14.80 | |
| WRAP-PAL | Pallet wrap 500mm × 400m | 0.0500 roll | — | — | $1.08 | |
| Material per pair | $745.18 | |||||
Routing
Setup once per batch, run time per pair.
| Seq | Work centre | What happens | Setup | Run per pair |
|---|---|---|---|---|
| 1 | Cutting | 4 rails at 3000mm, 20 rungs at 424mm | 12 min | 19 min |
| 2 | Drilling | Rail jig, headplate and pin holes | 8 min | 12 min |
| 3 | Welding | 40 rung joins, 2 headplates | 14 min | 49 min |
| 4 | Assembly | Nose, lugs, pins, ID plate | 6 min | 19 min |
| 5 | Inspection | Dimensional check and weld inspection | 10 min | 22 min |
| 6 | Packing | Bearers, strap, wrap, label | 4 min | 18 min |
Being built now
| Order | Came from | Qty | Stage | Due |
|---|---|---|---|---|
| PO-26-0439 | Sales order HJ-2026-0138 | 0/3 | Planned | 14 Aug |
| PO-26-0419 | Website order WEB-20420 | 0/1 | Planned | 20 Aug |
| PO-26-0425 | Website order WEB-20426 | 1/1 | Packing | 27 Aug |
Recent builds
The last 9 of this model off the floor.
| Serial | Built | Batch | Status | Warranty to |
|---|---|---|---|---|
| HY-26-41225 | 18 Aug | VUA-24574 | In service | 12 Aug |
| HY-26-41215 | 6 Aug | VUA-24711 | In stock | — |
| HY-26-41224 | 30 Jul | VUA-24573 | In service | 12 Aug |
| HY-26-41220 | 7 Jul | VUA-24317 | In service | 5 Aug |
| HY-26-41221 | 2 Jul | VUA-24337 | In service | 5 Aug |
| HY-26-41214 | 24 Jun | VUA-24526 | In stock | — |
| HY-24-41360 | 6 Dec | VUA-22594 | In service | 7 Jul |
| HY-26-41339 | 26 Sep | VUA-21863 | In service | 9 Apr |
| HY-24-41363 | 11 Mar | VUA-21087 | In service | 31 Mar |