L100 240
2200kg Aluminium Ramps at 2.4m
On the rack
7
pairs in FG-2
Free to promise
7
0 allocated
List ex GST
$1,640
$1,886 incl GST
Standard cost
$860
material and labour
Margin
47.6%
at list
Built to date
4
ramps on the register
Bill of materials
Per pair. Every production order for this model is raised from these lines.
| Code | Material | Qty per pair | Cut to | Pieces | Cost | Note |
|---|---|---|---|---|---|---|
| EXT-L100-SR | L100 side rail extrusion | 9.6000 m | 2,400mm | 4 | $295.68 | Side rails — 2 per ramp |
| EXT-RUNG-LT | Light rung — Hyway profile | 6.7840 m | 424mm | 16 | $120.08 | 8 rungs per ramp at 330mm centres |
| EXT-NOSE | Nose / toe extrusion | 0.8000 m | 400mm | 2 | $15.56 | Toe nose |
| PL-HP-8 | 8mm headplate plate 2500×1250 | 0.1429 sheet | — | 2 | $125.18 | Headplates — 14 per sheet |
| PL-GUSS-6 | 6mm gusset plate 1200×600 | 0.1000 sheet | — | 4 | $15.20 | Headplate gussets |
| PIN-14-S | 14mm steel pin, zinc plated | 2.0000 ea | — | 2 | $23.20 | Supplied with the ramps |
| PIN-CHAIN | Pin retaining chain, 300mm | 2.0000 ea | — | — | $7.80 | |
| WIRE-5356 | 5356 MIG wire 1.2mm, 7kg spool | 0.0365 spool | — | — | $4.31 | 6.1m of weld |
| GAS-ARG | Argon E-size cylinder | 0.0730 ea | — | — | $7.01 | |
| PLATE-ID | Serial identification plate | 2.0000 ea | — | — | $8.40 | Serial plate, one per ramp |
| RIVET-4 | 4mm rivet, stainless, pack of 500 | 0.0080 pack | — | — | $0.59 | |
| STRAP-PP | 19mm poly strapping, 1000m coil | 0.0120 coil | — | — | $1.03 | |
| TIMB-BEAR | Timber bearer 100×50, 1.2m | 2.0000 ea | — | — | $14.80 | |
| WRAP-PAL | Pallet wrap 500mm × 400m | 0.0500 roll | — | — | $1.08 | |
| Material per pair | $639.92 | |||||
Routing
Setup once per batch, run time per pair.
| Seq | Work centre | What happens | Setup | Run per pair |
|---|---|---|---|---|
| 1 | Cutting | 4 rails at 2400mm, 16 rungs at 424mm | 12 min | 17 min |
| 2 | Drilling | Rail jig, headplate and pin holes | 8 min | 11 min |
| 3 | Welding | 32 rung joins, 2 headplates | 14 min | 43 min |
| 4 | Assembly | Nose, lugs, pins, ID plate | 6 min | 18 min |
| 5 | Inspection | Dimensional check and weld inspection | 10 min | 22 min |
| 6 | Packing | Bearers, strap, wrap, label | 4 min | 17 min |
Being built now
| Order | Came from | Qty | Stage | Due |
|---|---|---|---|---|
| PO-26-0445 | Stock build Reorder point | 0/5 | Planned | 9 Sep |
Recent builds
The last 4 of this model off the floor.
| Serial | Built | Batch | Status | Warranty to |
|---|---|---|---|---|
| HY-26-41235 | 14 Jul | VUA-24824 | In service | 14 Aug |
| HY-26-41234 | 7 Jul | VUA-24300 | In service | 14 Aug |
| HY-25-41338 | 28 Oct | VUA-21811 | In service | 19 Aug |
| HY-26-41323 | 1 Oct | VUA-23463 | In service | 18 Apr |