Hyway Hyway
Hyway Hyway
Production order PO-26-0440 Demo 1 × L100 240 · Complete
Xero connected · synced 9:14am 19 Aug 2026
← The floor Complete
Pairs
1/1
none scrapped
Hours
2.8
against 3.0h estimated
Material issued
$640
of $640 planned
Scrap off the saw
0.00kg
0 cut plans run
Off the remnant rack
0.0m
metal not bought new
Routing
Standard minutes against booked, work centre by work centre.
SeqWork centreWhat happensWhoStatusStdBookedVariance
1 CUT Cutting — 4 rails at 2400mm, 16 rungs at 424mm Harinder Singh Done 29 min 32 +10%
2 DRILL Drilling — Rail jig, headplate and pin holes Harinder Singh Done 19 min 19 +0%
3 WELD Welding — 32 rung joins, 2 headplates Dion Field Done 57 min 53 -7%
4 ASSY Assembly — Nose, lugs, pins, ID plate Harinder Singh Done 24 min 26 +8%
5 INSP Inspection — Dimensional check and weld inspection Oliver Brewer Done 32 min 34 +6%
6 PACK Packing — Bearers, strap, wrap, label Nick Kennedy Done 21 min 19 -10%
Cutting and nesting
What has to be cut to length, and how it was nested onto bar and remnant.
ProfilePiecesCut toTotal lengthCut planYieldOff the rack
EXT-L100-SR
L100 side rail extrusion
4 2,400mm 9.60m Not run
EXT-NOSE
Nose / toe extrusion
2 400mm 0.80m Not run
EXT-RUNG-LT
Light rung — Hyway profile
16 424mm 6.78m Not run
Running the plan looks at what is on the remnant rack before it opens a new mill length, takes the shortest piece that will do the job, and puts anything over 600mm back on the rack as a new remnant.
Material
Required against issued, priced at what the buyer last paid.
CodeMaterialBinRequiredIssuedOn handCost
GAS-ARG Argon E-size cylinder RM-E1 0.073 ea 0.073 9.42 $7.01
WIRE-5356 5356 MIG wire 1.2mm, 7kg spool RM-E1 0.037 spool 0.037 20.76 $4.31
EXT-L100-SR L100 side rail extrusion
4 at 2400mm
RM-A3 9.600 m 9.600 290.80 $295.68
EXT-NOSE Nose / toe extrusion
2 at 400mm
RM-B1 0.800 m 0.800 279.80 $15.56
EXT-RUNG-LT Light rung — Hyway profile
16 at 424mm
RM-B1 6.784 m 6.784 547.70 $120.08
PLATE-ID Serial identification plate RM-D1 2.000 ea 2.000 434.26 $8.40
RIVET-4 4mm rivet, stainless, pack of 500 RM-D1 0.008 pack 0.008 12.05 $0.59
STRAP-PP 19mm poly strapping, 1000m coil RM-E1 0.012 coil 0.012 5.80 $1.03
TIMB-BEAR Timber bearer 100×50, 1.2m RM-E1 2.000 ea 2.000 247.68 $14.80
WRAP-PAL Pallet wrap 500mm × 400m RM-E1 0.050 roll 0.050 20.67 $1.08
PIN-14-S 14mm steel pin, zinc plated RM-D1 2.000 ea 2.000 423.19 $23.20
PIN-CHAIN Pin retaining chain, 300mm RM-D1 2.000 ea 2.000 725.03 $7.80
PL-GUSS-6 6mm gusset plate 1200×600 RM-C1 0.100 sheet 0.100 13.40 $15.20
PL-HP-8 8mm headplate plate 2500×1250 RM-C1 0.143 sheet 0.143 14.05 $125.18
Planned material$639.92
Labour booked
3.1 hours off the floor against this order.
DateWhoWork centreMinutesDoneScrapNote
19 Aug Nick Kennedy PACK 19 1
19 Aug Oliver Brewer INSP 34 1
18 Aug Harinder Singh ASSY 26 1
18 Aug Dion Field WELD 53 1
18 Aug Harinder Singh DRILL 19 1
18 Aug Harinder Singh CUT 32 1
Ramps built
One serial per ramp, with the batch it came from and who signed it off.
SerialBuiltCapacityLengthBatchWelderInspectedStatus
HY-26-41234 7 Jul 2,200kg 2.4m VUA-24300 Nelson De Villa Oliver Brewer In service
HY-26-41235 14 Jul 2,200kg 2.4m VUA-24824 Nelson De Villa Oliver Brewer In service