Production order PO-26-0443 Demo 5 × L70 150 · Cutting
Xero connected · synced 9:14am 19 Aug 2026
← The floor Cutting
Pairs
0/5
none scrapped
Hours
1.5
against 10.2h estimated
Material issued
$778
of $1,388 planned
Scrap off the saw
0.00kg
0 cut plans run
Off the remnant rack
0.0m
metal not bought new
Routing
Standard minutes against booked, work centre by work centre.
SeqWork centreWhat happensWhoStatusStdBookedVariance
1 CUT Cutting — 4 rails at 1500mm, 10 rungs at 314mm Harinder Singh Running 87 min 33 -62%
2 DRILL Drilling — Rail jig, headplate and pin holes Harinder Singh Waiting 53 min
3 WELD Welding — 20 rung joins, 2 headplates Dion Field Waiting 184 min
4 ASSY Assembly — Nose, lugs, pins, ID plate Harinder Singh Waiting 91 min
5 INSP Inspection — Dimensional check and weld inspection Oliver Brewer Waiting 120 min
6 PACK Packing — Bearers, strap, wrap, label Nick Kennedy Waiting 79 min
Cutting and nesting
What has to be cut to length, and how it was nested onto bar and remnant.
ProfilePiecesCut toTotal lengthCut planYieldOff the rack
EXT-L70-SR
L70 side rail extrusion
20 1,500mm 30.00m Not run
EXT-NOSE
Nose / toe extrusion
10 290mm 2.90m Not run
EXT-RUNG-LT
Light rung — Hyway profile
50 314mm 15.70m Not run
Running the plan looks at what is on the remnant rack before it opens a new mill length, takes the shortest piece that will do the job, and puts anything over 600mm back on the rack as a new remnant.
Material
Required against issued, priced at what the buyer last paid.
CodeMaterialBinRequiredIssuedOn handCost
GAS-ARG Argon E-size cylinder RM-E1 0.300 ea 0.000 9.42 $28.80
WIRE-4043 4043 MIG wire 1.2mm, 7kg spool RM-E1 0.150 spool 0.000 10.18 $15.60
EXT-L70-SR L70 side rail extrusion
20 at 1500mm
RM-A3 30.000 m 30.000 399.90 $444.00
EXT-NOSE Nose / toe extrusion
10 at 290mm
RM-B1 2.900 m 2.900 279.80 $56.41
EXT-RUNG-LT Light rung — Hyway profile
50 at 314mm
RM-B1 15.700 m 15.700 547.70 $277.89
PLATE-ID Serial identification plate RM-D1 10.000 ea 0.000 434.26 $42.00
RIVET-4 4mm rivet, stainless, pack of 500 RM-D1 0.040 pack 0.000 12.05 $2.96
STRAP-PP 19mm poly strapping, 1000m coil RM-E1 0.060 coil 0.000 5.80 $5.16
TIMB-BEAR Timber bearer 100×50, 1.2m RM-E1 10.000 ea 0.000 247.68 $74.00
WRAP-PAL Pallet wrap 500mm × 400m RM-E1 0.250 roll 0.000 20.67 $5.38
PIN-10-S 10mm steel pin, zinc plated RM-D1 10.000 ea 0.000 443.47 $84.00
PIN-CHAIN Pin retaining chain, 300mm RM-D1 10.000 ea 0.000 725.03 $39.00
PL-HP-6 6mm headplate plate 2500×1250 RM-C1 0.476 sheet 0.000 20.23 $312.73
Planned material$1,387.93
Labour booked
0.6 hours off the floor against this order.
DateWhoWork centreMinutesDoneScrapNote
19 Aug Harinder Singh CUT 33