Production order PO-26-0114 Demo 2 × ATVR21 · Complete
Xero connected · synced 9:14am 19 Aug 2026
← The floor Complete
Pairs
2/2
none scrapped
Hours
3.0
against 2.8h estimated
Material issued
$0
of $0 planned
Scrap off the saw
0.00kg
0 cut plans run
Off the remnant rack
0.0m
metal not bought new
Routing
Standard minutes against booked, work centre by work centre.
SeqWork centreWhat happensWhoStatusStdBookedVariance
1 CUT Cutting — 4 rails at 2100mm, 16 rungs at 264mm Harinder Singh Done 28 min 30 +7%
2 DRILL Drilling — Rail jig, headplate and pin holes Harinder Singh Done 18 min 19 +6%
3 WELD Welding — 32 rung joins, 2 headplates Nelson De Villa Done 52 min 55 +6%
4 ASSY Assembly — Nose, lugs, pins, ID plate Harinder Singh Done 22 min 23 +5%
5 INSP Inspection — Dimensional check and weld inspection Oliver Brewer Done 30 min 32 +7%
6 PACK Packing — Bearers, strap, wrap, label Nick Kennedy Done 18 min 19 +6%
Cutting and nesting
What has to be cut to length, and how it was nested onto bar and remnant.
Nothing on this order is cut to length.
Material
Required against issued, priced at what the buyer last paid.
CodeMaterialBinRequiredIssuedOn handCost
Planned material$0.00
Labour booked
3.0 hours off the floor against this order.
DateWhoWork centreMinutesDoneScrapNote
19 Aug Nick Kennedy PACK 19 2
19 Aug Oliver Brewer INSP 32 2
19 Aug Nelson De Villa WELD 55 2
19 Aug Harinder Singh DRILL 19 2
19 Aug Harinder Singh CUT 30 2
18 Aug Harinder Singh ASSY 23 2
Ramps built
One serial per ramp, with the batch it came from and who signed it off.
SerialBuiltCapacityLengthBatchWelderInspectedStatus
HY-26-41286 20 Jul 500kg 2.1m VUA-24332 Nelson De Villa Oliver Brewer In service
HY-26-41287 10 Aug 500kg 2.1m VUA-24284 Dion Field Oliver Brewer In service
HY-26-41288 3 Aug 500kg 2.1m VUA-24499 Dion Field Oliver Brewer In service
HY-26-41289 27 Jul 500kg 2.1m VUA-24164 Dion Field Oliver Brewer In service