Hyway Hyway
Hyway Hyway
Production order PO-26-0112 Demo 1 × L100 210 · Complete
Xero connected · synced 9:14am 19 Aug 2026
← The floor Complete
Pairs
1/1
none scrapped
Hours
3.7
against 2.9h estimated
Material issued
$0
of $0 planned
Scrap off the saw
0.00kg
0 cut plans run
Off the remnant rack
0.0m
metal not bought new
Routing
Standard minutes against booked, work centre by work centre.
SeqWork centreWhat happensWhoStatusStdBookedVariance
1 CUT Cutting — 4 rails at 2100mm, 14 rungs at 424mm Harinder Singh Done 28 min 35 +25%
2 DRILL Drilling — Rail jig, headplate and pin holes Harinder Singh Done 18 min 23 +28%
3 WELD Welding — 28 rung joins, 2 headplates Dion Field Done 54 min 68 +26%
4 ASSY Assembly — Nose, lugs, pins, ID plate Harinder Singh Done 24 min 30 +25%
5 INSP Inspection — Dimensional check and weld inspection Oliver Brewer Done 32 min 40 +25%
6 PACK Packing — Bearers, strap, wrap, label Nick Kennedy Done 20 min 25 +25%
Cutting and nesting
What has to be cut to length, and how it was nested onto bar and remnant.
Nothing on this order is cut to length.
Material
Required against issued, priced at what the buyer last paid.
CodeMaterialBinRequiredIssuedOn handCost
Planned material$0.00
Labour booked
3.7 hours off the floor against this order.
DateWhoWork centreMinutesDoneScrapNote
19 Aug Nick Kennedy PACK 25 1
19 Aug Oliver Brewer INSP 40 1
19 Aug Harinder Singh ASSY 30 1
19 Aug Dion Field WELD 68 1
19 Aug Harinder Singh DRILL 23 1
18 Aug Harinder Singh CUT 35 1
Ramps built
One serial per ramp, with the batch it came from and who signed it off.
SerialBuiltCapacityLengthBatchWelderInspectedStatus
HY-26-41282 13 Aug 2,500kg 2.1m VUA-24733 Nelson De Villa Oliver Brewer In service
HY-26-41283 6 Aug 2,500kg 2.1m VUA-24305 Dion Field Oliver Brewer In service