Production is held on this job
Nothing goes to the floor until the deposit has been received and the customer has approved the drawing. PO-26-0406 is waiting.
Deposit
$0 of $699
Drawing
HD-0139 Rev B
Contract value
$1,397
no variations
Quoted cost
$791
$491 material · 3.1h
Actual so far
$0
$0 material · 0.0h
Margin
43.3%
on the quote
Invoiced
$0
$0 received
The specification
Captured on the enquiry and unchanged since. Variations sit alongside it, not over it.
Kawasaki Mule Pro-FXR side-by-side
| All-up weight | 680kg |
| Axle / track load | 380kg |
| Track width | 1,400mm |
| Deck height | 620mm |
| Gradient | 33% |
| Attachment | Hook over |
The ramps
1,000kg
rated per pair
1.9m
length
350mm
rung width
L75
profile
Anti-slip decking, Extra pins
Production
What is being built against this job.
| Order | Model | Qty | Stage | Hours | Material | Due |
|---|---|---|---|---|---|---|
| PO-26-0406 Deposit outstanding and drawing not approved | L75 180 1700kg Aluminium Ramps at 1.8m | 0/1 | Planned | 0.0 / 2.9 | $0 / $381 | 3 Sep |
Variations
Priced and approved separately. The original quotation and specification stay as they were.
None on this job.
Drawings and documents
The workshop only ever sees the current revision.
| Document | Kind | Rev | Status | Filed by | When |
|---|---|---|---|---|---|
| HD-0139 Rev A — general arrangement | Drawing | A | Superseded | Oliver Brewer | 8 Aug, 08:20 |
| HD-0139 Rev B — general arrangement | Drawing | B | Awaiting approval | Oliver Brewer | 26 Jul, 09:20 |
| Site photos — deck height and attachment | Photo | A | Current | Nick Harrison | 4 Aug, 15:10 |
| Safe use and inspection booklet | Safety | 2026-1 | Current | Leigh Sharland | 6 Aug, 10:00 |
| Machine specification sheet — customer supplied | Specification | A | Current | Nick Harrison | 23 Jun, 11:05 |