Production is held on this job
Nothing goes to the floor until the deposit has been received and the customer has approved the drawing. PO-26-0398 is waiting.
Deposit
$0 of $1,372
Drawing
HD-0129 Rev C
Approved
Contract value
$2,744
no variations
Quoted cost
$1,567
$971 material · 6.1h
Actual so far
$0
$0 material · 0.0h
Margin
42.9%
on the quote
Invoiced
$0
$0 received
The specification
Captured on the enquiry and unchanged since. Variations sit alongside it, not over it.
Kawasaki Mule Pro-FXR side-by-side
| All-up weight | 680kg |
| Axle / track load | 380kg |
| Track width | 1,400mm |
| Deck height | 620mm |
| Gradient | 33% |
| Attachment | Hook over |
The ramps
1,000kg
rated per pair
1.9m
length
350mm
rung width
L75
profile
ID welding, Extra pins
Production
What is being built against this job.
| Order | Model | Qty | Stage | Hours | Material | Due |
|---|---|---|---|---|---|---|
| PO-26-0398 Deposit outstanding | L75 180 1700kg Aluminium Ramps at 1.8m | 0/2 | Planned | 0.0 / 4.8 | $0 / $763 | 7 Sep |
Variations
Priced and approved separately. The original quotation and specification stay as they were.
None on this job.
Drawings and documents
The workshop only ever sees the current revision.
| Document | Kind | Rev | Status | Filed by | When |
|---|---|---|---|---|---|
| Signed drawing approval | Approval | A | Current | Leigh Sharland | 31 Jul, 14:40 |
| HD-0129 Rev B — general arrangement | Drawing | B | Superseded | Oliver Brewer | 13 Aug, 09:20 |
| HD-0129 Rev A — general arrangement | Drawing | A | Superseded | Oliver Brewer | 4 Aug, 08:20 |
| HD-0129 Rev C — general arrangement | Drawing | C | Current | Oliver Brewer | 26 Jul, 10:20 |
| Safe use and inspection booklet | Safety | 2026-1 | Current | Leigh Sharland | 5 Aug, 10:00 |
| Machine specification sheet — customer supplied | Specification | A | Current | Nick Harrison | 25 Jun, 11:05 |