Job HJ-2026-0129 Demo Timaru District Council · Custom ramps — Kawasaki Mule Pro-FXR side-by-side
Xero connected · synced 9:14am 19 Aug 2026
← Jobs Approval Custom Production held
Quote Q-2026-0397
Production is held on this job

Nothing goes to the floor until the deposit has been received and the customer has approved the drawing. PO-26-0398 is waiting.

Deposit
$0 of $1,372
Drawing
HD-0129 Rev C
Approved
Contract value
$2,744
no variations
Quoted cost
$1,567
$971 material · 6.1h
Actual so far
$0
$0 material · 0.0h
Margin
42.9%
on the quote
Invoiced
$0
$0 received
The specification
Captured on the enquiry and unchanged since. Variations sit alongside it, not over it.
Kawasaki Mule Pro-FXR side-by-side
All-up weight680kg
Axle / track load380kg
Track width1,400mm
Deck height620mm
Gradient33%
AttachmentHook over
The ramps
1,000kg
rated per pair
1.9m
length
350mm
rung width
L75
profile
ID welding, Extra pins
Production
What is being built against this job.
OrderModelQtyStageHoursMaterialDue
PO-26-0398
Deposit outstanding
L75 180
1700kg Aluminium Ramps at 1.8m
0/2 Planned 0.0 / 4.8 $0 / $763 7 Sep
Variations
Priced and approved separately. The original quotation and specification stay as they were.
None on this job.
Drawings and documents
The workshop only ever sees the current revision.
DocumentKindRevStatusFiled byWhen
Signed drawing approval Approval A Current Leigh Sharland 31 Jul, 14:40
HD-0129 Rev B — general arrangement Drawing B Superseded Oliver Brewer 13 Aug, 09:20
HD-0129 Rev A — general arrangement Drawing A Superseded Oliver Brewer 4 Aug, 08:20
HD-0129 Rev C — general arrangement Drawing C Current Oliver Brewer 26 Jul, 10:20
Safe use and inspection booklet Safety 2026-1 Current Leigh Sharland 5 Aug, 10:00
Machine specification sheet — customer supplied Specification A Current Nick Harrison 25 Jun, 11:05