Contract value
$5,190
no variations
Quoted cost
$3,012
$1,867 material · 11.7h
Actual so far
$607
$488 material · 1.2h
Margin
42.0%
on the quote
Invoiced
$2,257
$2,595 received
The specification
Captured on the enquiry and unchanged since. Variations sit alongside it, not over it.
Wacker Neuson DV90 dumper
| All-up weight | 3,600kg |
| Axle / track load | 2,000kg |
| Track width | 1,780mm |
| Deck height | 900mm |
| Gradient | 30% |
| Attachment | Steel pins |
The ramps
4,250kg
rated per pair
3.0m
length
450mm
rung width
150
profile
Production
What is being built against this job.
| Order | Model | Qty | Stage | Hours | Material | Due |
|---|---|---|---|---|---|---|
| PO-26-0394 | 150/330 4500kg Aluminium Ramps at 3.3m | 0/2 | Cutting | 1.2 / 7.4 | $488 / $2,345 | 14 Sep |
Variations
Priced and approved separately. The original quotation and specification stay as they were.
None on this job.
Drawings and documents
The workshop only ever sees the current revision.
| Document | Kind | Rev | Status | Filed by | When |
|---|---|---|---|---|---|
| Signed drawing approval | Approval | A | Current | Leigh Sharland | 21 Jul, 14:40 |
| HD-0125 Rev A — general arrangement | Drawing | A | Current | Oliver Brewer | 2 Aug, 08:20 |
| Site photos — deck height and attachment | Photo | A | Current | Nick Harrison | 9 Jul, 15:10 |
| Safe use and inspection booklet | Safety | 2026-1 | Current | Leigh Sharland | 15 Aug, 10:00 |
| Machine specification sheet — customer supplied | Specification | A | Current | Nick Harrison | 4 Jul, 11:05 |
Labour booked
1.2 hours against 7.4 estimated.
| Date | Who | Centre | Order | Minutes | Note |
|---|---|---|---|---|---|
| 19 Aug | Harinder Singh | CUT | PO-26-0394 | 26 |