Production order PO-26-0123 Demo 2 × 175/360 · Complete
Xero connected · synced 9:14am 19 Aug 2026
← The floor Complete
Pairs
2/2
1 scrapped
Hours
7.7
against 7.9h estimated
Material issued
$0
of $0 planned
Scrap off the saw
0.00kg
0 cut plans run
Off the remnant rack
0.0m
metal not bought new
Routing
Standard minutes against booked, work centre by work centre.
SeqWork centreWhat happensWhoStatusStdBookedVariance
1 CUT Cutting — 4 rails at 3600mm, 26 rungs at 474mm Harinder Singh Done 70 min 68 -3%
2 DRILL Drilling — Rail jig, headplate and pin holes Harinder Singh Done 46 min 45 -2%
3 WELD Welding — 52 rung joins, 2 headplates Nelson De Villa Done 172 min 168 -2%
4 ASSY Assembly — Nose, lugs, pins, ID plate Harinder Singh Done 62 min 61 -2%
5 INSP Inspection — Proof load and dimensional check Oliver Brewer Done 70 min 68 -3%
6 PACK Packing — Bearers, strap, wrap, label Nick Kennedy Done 56 min 55 -2%
Cutting and nesting
What has to be cut to length, and how it was nested onto bar and remnant.
Nothing on this order is cut to length.
Material
Required against issued, priced at what the buyer last paid.
CodeMaterialBinRequiredIssuedOn handCost
Planned material$0.00
Labour booked
7.8 hours off the floor against this order.
DateWhoWork centreMinutesDoneScrapNote
19 Aug Nick Kennedy PACK 55 2
19 Aug Harinder Singh ASSY 61 2
19 Aug Harinder Singh DRILL 45 2
18 Aug Oliver Brewer INSP 68 2
18 Aug Nelson De Villa WELD 168 2 Rework ·
18 Aug Harinder Singh CUT 68 2
Ramps built
One serial per ramp, with the batch it came from and who signed it off.
SerialBuiltCapacityLengthBatchWelderInspectedStatus
HY-26-41316 29 Jun 6,000kg 3.6m VUA-24394 Nelson De Villa Oliver Brewer In service
HY-26-41317 20 Jul 6,000kg 3.6m VUA-24778 Dion Field Oliver Brewer In service
HY-26-41318 24 Jul 6,000kg 3.6m VUA-24566 Nelson De Villa Oliver Brewer In service
HY-26-41319 17 Aug 6,000kg 3.6m VUA-24973 Nelson De Villa Oliver Brewer In service