Hyway Hyway
Hyway Hyway
Production order PO-26-0117 Demo 4 × L75 240 · Complete
Xero connected · synced 9:14am 19 Aug 2026
← The floor Complete
Pairs
4/4
none scrapped
Hours
10.5
against 9.4h estimated
Material issued
$0
of $0 planned
Scrap off the saw
0.00kg
0 cut plans run
Off the remnant rack
0.0m
metal not bought new
Routing
Standard minutes against booked, work centre by work centre.
SeqWork centreWhat happensWhoStatusStdBookedVariance
1 CUT Cutting — 4 rails at 2400mm, 16 rungs at 374mm Harinder Singh Done 80 min 89 +11%
2 DRILL Drilling — Rail jig, headplate and pin holes Harinder Singh Done 52 min 58 +12%
3 WELD Welding — 32 rung joins, 2 headplates Nelson De Villa Done 186 min 207 +11%
4 ASSY Assembly — Nose, lugs, pins, ID plate Harinder Singh Done 78 min 87 +12%
5 INSP Inspection — Dimensional check and weld inspection Oliver Brewer Done 98 min 109 +11%
6 PACK Packing — Bearers, strap, wrap, label Nick Kennedy Done 72 min 80 +11%
Cutting and nesting
What has to be cut to length, and how it was nested onto bar and remnant.
Nothing on this order is cut to length.
Material
Required against issued, priced at what the buyer last paid.
CodeMaterialBinRequiredIssuedOn handCost
Planned material$0.00
Labour booked
10.5 hours off the floor against this order.
DateWhoWork centreMinutesDoneScrapNote
19 Aug Nick Kennedy PACK 80 4
19 Aug Harinder Singh DRILL 58 4
18 Aug Oliver Brewer INSP 109 4
18 Aug Harinder Singh ASSY 87 4
18 Aug Nelson De Villa WELD 207 4
18 Aug Harinder Singh CUT 89 4
Ramps built
One serial per ramp, with the batch it came from and who signed it off.
SerialBuiltCapacityLengthBatchWelderInspectedStatus
HY-26-41294 17 Aug 1,200kg 2.4m VUA-24131 Dion Field Oliver Brewer In service
HY-26-41295 6 Aug 1,200kg 2.4m VUA-24898 Nelson De Villa Oliver Brewer In service
HY-26-41296 5 Aug 1,200kg 2.4m VUA-24385 Dion Field Oliver Brewer In service
HY-26-41297 30 Jun 1,200kg 2.4m VUA-24834 Dion Field Oliver Brewer In service
HY-26-41298 6 Jul 1,200kg 2.4m VUA-24670 Dion Field Oliver Brewer In service
HY-26-41299 16 Jul 1,200kg 2.4m VUA-24022 Nelson De Villa Oliver Brewer In service
HY-26-41300 26 Jun 1,200kg 2.4m VUA-24597 Dion Field Oliver Brewer In service
HY-26-41301 11 Aug 1,200kg 2.4m VUA-24637 Nelson De Villa Oliver Brewer In service