Hyway Hyway
Hyway Hyway
Production order PO-26-0108 Demo 4 × L75 300 · Complete
Xero connected · synced 9:14am 19 Aug 2026
← The floor Complete
Pairs
4/4
1 scrapped
Hours
11.0
against 9.8h estimated
Material issued
$0
of $0 planned
Scrap off the saw
0.00kg
0 cut plans run
Off the remnant rack
0.0m
metal not bought new
Routing
Standard minutes against booked, work centre by work centre.
SeqWork centreWhat happensWhoStatusStdBookedVariance
1 CUT Cutting — 4 rails at 3000mm, 18 rungs at 374mm Harinder Singh Done 84 min 94 +12%
2 DRILL Drilling — Rail jig, headplate and pin holes Harinder Singh Done 52 min 58 +12%
3 WELD Welding — 36 rung joins, 2 headplates Nelson De Villa Done 198 min 221 +12%
4 ASSY Assembly — Nose, lugs, pins, ID plate Harinder Singh Done 82 min 91 +11%
5 INSP Inspection — Dimensional check and weld inspection Oliver Brewer Done 98 min 109 +11%
6 PACK Packing — Bearers, strap, wrap, label Nick Kennedy Done 76 min 85 +12%
Cutting and nesting
What has to be cut to length, and how it was nested onto bar and remnant.
Nothing on this order is cut to length.
Material
Required against issued, priced at what the buyer last paid.
CodeMaterialBinRequiredIssuedOn handCost
Planned material$0.00
Labour booked
11.0 hours off the floor against this order.
DateWhoWork centreMinutesDoneScrapNote
19 Aug Harinder Singh ASSY 91 4
19 Aug Harinder Singh DRILL 58 4
18 Aug Nick Kennedy PACK 85 4
18 Aug Oliver Brewer INSP 109 4
18 Aug Nelson De Villa WELD 221 4
18 Aug Harinder Singh CUT 94 4
Ramps built
One serial per ramp, with the batch it came from and who signed it off.
SerialBuiltCapacityLengthBatchWelderInspectedStatus
HY-26-41264 11 Aug 900kg 3.0m VUA-24558 Dion Field Oliver Brewer In service
HY-26-41265 24 Jul 900kg 3.0m VUA-24355 Dion Field Oliver Brewer In service
HY-26-41266 10 Aug 900kg 3.0m VUA-24843 Nelson De Villa Oliver Brewer In service
HY-26-41267 10 Jul 900kg 3.0m VUA-24363 Nelson De Villa Oliver Brewer In service
HY-26-41268 13 Jul 900kg 3.0m VUA-24752 Nelson De Villa Oliver Brewer In service
HY-26-41269 7 Aug 900kg 3.0m VUA-24905 Dion Field Oliver Brewer In service
HY-26-41270 22 Jul 900kg 3.0m VUA-24734 Dion Field Oliver Brewer In service
HY-26-41271 22 Jul 900kg 3.0m VUA-24394 Dion Field Oliver Brewer In service