Hyway Hyway
Hyway Hyway
Production order PO-26-0104 Demo 1 × 150/330 · Complete
Xero connected · synced 9:14am 19 Aug 2026
← The floor Complete
Pairs
1/1
none scrapped
Hours
3.8
against 4.2h estimated
Material issued
$0
of $0 planned
Scrap off the saw
0.00kg
0 cut plans run
Off the remnant rack
0.0m
metal not bought new
Routing
Standard minutes against booked, work centre by work centre.
SeqWork centreWhat happensWhoStatusStdBookedVariance
1 CUT Cutting — 4 rails at 3300mm, 22 rungs at 424mm Harinder Singh Done 39 min 35 -10%
2 DRILL Drilling — Rail jig, headplate and pin holes Harinder Singh Done 25 min 23 -8%
3 WELD Welding — 44 rung joins, 2 headplates Nelson De Villa Done 84 min 76 -10%
4 ASSY Assembly — Nose, lugs, pins, ID plate Harinder Singh Done 32 min 29 -9%
5 INSP Inspection — Proof load and dimensional check Oliver Brewer Done 40 min 36 -10%
6 PACK Packing — Bearers, strap, wrap, label Nick Kennedy Done 29 min 26 -10%
Cutting and nesting
What has to be cut to length, and how it was nested onto bar and remnant.
Nothing on this order is cut to length.
Material
Required against issued, priced at what the buyer last paid.
CodeMaterialBinRequiredIssuedOn handCost
Planned material$0.00
Labour booked
3.8 hours off the floor against this order.
DateWhoWork centreMinutesDoneScrapNote
19 Aug Oliver Brewer INSP 36 1
19 Aug Harinder Singh ASSY 29 1
18 Aug Nick Kennedy PACK 26 1
18 Aug Nelson De Villa WELD 76 1
18 Aug Harinder Singh DRILL 23 1
18 Aug Harinder Singh CUT 35 1
Ramps built
One serial per ramp, with the batch it came from and who signed it off.
SerialBuiltCapacityLengthBatchWelderInspectedStatus
HY-26-41256 24 Jul 4,500kg 3.3m VUA-24559 Dion Field Oliver Brewer In service
HY-26-41257 29 Jul 4,500kg 3.3m VUA-24457 Nelson De Villa Oliver Brewer In service