Contract value
$4,545
no variations
Quoted cost
$2,637
$1,635 material · 10.2h
Actual so far
$2,084
$1,598 material · 5.0h
Margin
54.2%
on actual cost
Invoiced
$4,545
$5,726 received
The specification
Captured on the enquiry and unchanged since. Variations sit alongside it, not over it.
Komatsu PC138US-11 excavator
| All-up weight | 13,800kg |
| Axle / track load | 7,100kg |
| Track width | 2,320mm |
| Deck height | 1,150mm |
| Gradient | 28% |
| Attachment | Lugs |
The ramps
15,000kg
rated per pair
4.1m
length
600mm
rung width
200
profile
Anti-slip decking
Production
What is being built against this job.
| Order | Model | Qty | Stage | Hours | Material | Due |
|---|---|---|---|---|---|---|
| PO-26-0100 | 200/360 7500kg Aluminium Ramps at 3.6m | 1/1 | Complete | 5.0 / 4.4 | $1,598 / $1,635 | 23 Jun |
Variations
Priced and approved separately. The original quotation and specification stay as they were.
None on this job.
Drawings and documents
The workshop only ever sees the current revision.
Nothing filed against this job.
Ramps built on this job
Serial numbers stay against the job and the customer for the life of the ramp.
| Serial | Model | Built | Batch | Welder | Status | Warranty to |
|---|---|---|---|---|---|---|
| HY-26-41242 | 200/360 | 20 Jul | VUA-24359 | Dion Field | In service | 3 Aug |
| HY-26-41243 | 200/360 | 17 Jul | VUA-24812 | Dion Field | In service | 3 Aug |
Labour booked
5.0 hours against 4.4 estimated.
| Date | Who | Centre | Order | Minutes | Note |
|---|---|---|---|---|---|
| 19 Aug | Nelson De Villa | WELD | PO-26-0100 | 104 | |
| 19 Aug | Nick Kennedy | PACK | PO-26-0100 | 34 | |
| 18 Aug | Harinder Singh | CUT | PO-26-0100 | 46 | |
| 18 Aug | Harinder Singh | DRILL | PO-26-0100 | 30 | |
| 18 Aug | Harinder Singh | ASSY | PO-26-0100 | 38 | |
| 18 Aug | Oliver Brewer | INSP | PO-26-0100 | 45 |