Hyway Hyway
Hyway Hyway
Production order PO-26-0119 Demo 1 × L75 180 · Complete
Xero connected · synced 9:14am 19 Aug 2026
← The floor Complete
Pairs
1/1
none scrapped
Hours
2.7
against 2.9h estimated
Material issued
$0
of $0 planned
Scrap off the saw
0.00kg
0 cut plans run
Off the remnant rack
0.0m
metal not bought new
Routing
Standard minutes against booked, work centre by work centre.
SeqWork centreWhat happensWhoStatusStdBookedVariance
1 CUT Cutting — 4 rails at 1800mm, 12 rungs at 374mm Harinder Singh Done 27 min 25 -7%
2 DRILL Drilling — Rail jig, headplate and pin holes Harinder Singh Done 18 min 17 -6%
3 WELD Welding — 24 rung joins, 2 headplates Dion Field Done 51 min 48 -6%
4 ASSY Assembly — Nose, lugs, pins, ID plate Harinder Singh Done 23 min 22 -4%
5 INSP Inspection — Dimensional check and weld inspection Oliver Brewer Done 32 min 30 -6%
6 PACK Packing — Bearers, strap, wrap, label Nick Kennedy Done 20 min 19 -5%
Cutting and nesting
What has to be cut to length, and how it was nested onto bar and remnant.
Nothing on this order is cut to length.
Material
Required against issued, priced at what the buyer last paid.
CodeMaterialBinRequiredIssuedOn handCost
Planned material$0.00
Labour booked
2.7 hours off the floor against this order.
DateWhoWork centreMinutesDoneScrapNote
19 Aug Nick Kennedy PACK 19 1
19 Aug Oliver Brewer INSP 30 1
19 Aug Harinder Singh ASSY 22 1
19 Aug Harinder Singh DRILL 17 1
18 Aug Dion Field WELD 48 1
18 Aug Harinder Singh CUT 25 1
Ramps built
One serial per ramp, with the batch it came from and who signed it off.
SerialBuiltCapacityLengthBatchWelderInspectedStatus
HY-26-41304 9 Jul 1,700kg 1.8m VUA-24647 Dion Field Oliver Brewer In service
HY-26-41305 3 Jul 1,700kg 1.8m VUA-24915 Nelson De Villa Oliver Brewer In service