Hyway Hyway
Hyway Hyway
Production order PO-26-0106 Demo 1 × L75 180 · Complete
Xero connected · synced 9:14am 19 Aug 2026
← The floor Complete
Pairs
1/1
none scrapped
Hours
2.5
against 2.9h estimated
Material issued
$0
of $0 planned
Scrap off the saw
0.00kg
0 cut plans run
Off the remnant rack
0.0m
metal not bought new
Routing
Standard minutes against booked, work centre by work centre.
SeqWork centreWhat happensWhoStatusStdBookedVariance
1 CUT Cutting — 4 rails at 1800mm, 12 rungs at 374mm Harinder Singh Done 27 min 24 -11%
2 DRILL Drilling — Rail jig, headplate and pin holes Harinder Singh Done 18 min 16 -11%
3 WELD Welding — 24 rung joins, 2 headplates Nelson De Villa Done 51 min 45 -12%
4 ASSY Assembly — Nose, lugs, pins, ID plate Harinder Singh Done 23 min 20 -13%
5 INSP Inspection — Dimensional check and weld inspection Oliver Brewer Done 32 min 28 -13%
6 PACK Packing — Bearers, strap, wrap, label Nick Kennedy Done 20 min 18 -10%
Cutting and nesting
What has to be cut to length, and how it was nested onto bar and remnant.
Nothing on this order is cut to length.
Material
Required against issued, priced at what the buyer last paid.
CodeMaterialBinRequiredIssuedOn handCost
Planned material$0.00
Labour booked
2.5 hours off the floor against this order.
DateWhoWork centreMinutesDoneScrapNote
19 Aug Nick Kennedy PACK 18 1
19 Aug Oliver Brewer INSP 28 1
19 Aug Nelson De Villa WELD 45 1 Rework ·
19 Aug Harinder Singh CUT 24 1
18 Aug Harinder Singh ASSY 20 1
18 Aug Harinder Singh DRILL 16 1
Ramps built
One serial per ramp, with the batch it came from and who signed it off.
SerialBuiltCapacityLengthBatchWelderInspectedStatus
HY-26-41260 20 Jul 1,700kg 1.8m VUA-24032 Dion Field Oliver Brewer In service
HY-26-41261 8 Jul 1,700kg 1.8m VUA-24094 Dion Field Oliver Brewer In service