Hyway Hyway
Hyway Hyway
Job HJ-2026-0128 Demo Northland Forestry Transport · Custom ramps — Toro Groundsmaster 4000-D mower
Xero connected · synced 9:14am 19 Aug 2026
← Jobs Packing Custom
Quote Q-2026-0396
Contract value
$2,100
no variations
Quoted cost
$1,191
$739 material · 4.6h
Actual so far
$868
$588 material · 2.9h
Margin
43.3%
on the quote
Invoiced
$913
$1,050 received
The specification
Captured on the enquiry and unchanged since. Variations sit alongside it, not over it.
Toro Groundsmaster 4000-D mower
All-up weight1,450kg
Axle / track load800kg
Track width1,620mm
Deck height760mm
Gradient33%
AttachmentHook over
The ramps
1,750kg
rated per pair
2.3m
length
400mm
rung width
L100
profile
Wide track
Production
What is being built against this job.
OrderModelQtyStageHoursMaterialDue
PO-26-0397 L100 210
2500kg Aluminium Ramps at 2.1m
1/1 Packing 2.9 / 2.9 $588 / $587 8 Sep
Variations
Priced and approved separately. The original quotation and specification stay as they were.
None on this job.
Drawings and documents
The workshop only ever sees the current revision.
DocumentKindRevStatusFiled byWhen
Signed drawing approval Approval A Current Leigh Sharland 6 Aug, 14:40
HD-0128 Rev B — general arrangement Drawing B Current Oliver Brewer 13 Aug, 09:20
HD-0128 Rev A — general arrangement Drawing A Superseded Oliver Brewer 6 Aug, 08:20
Site photos — deck height and attachment Photo A Current Nick Harrison 28 Jul, 15:10
Safe use and inspection booklet Safety 2026-1 Current Leigh Sharland 9 Aug, 10:00
Machine specification sheet — customer supplied Specification A Current Nick Harrison 27 Jul, 11:05
Ramps built on this job
Serial numbers stay against the job and the customer for the life of the ramp.
SerialModelBuiltBatchWelderStatusWarranty to
HY-26-41186 L100 210 26 Jun VUA-24449 Nelson De Villa In stock
HY-26-41187 L100 210 30 Jun VUA-24015 Dion Field In stock
Labour booked
2.9 hours against 2.9 estimated.
DateWhoCentreOrderMinutesNote
19 Aug Harinder Singh CUT PO-26-0397 29
19 Aug Harinder Singh ASSY PO-26-0397 26
19 Aug Nick Kennedy PACK PO-26-0397 11
18 Aug Harinder Singh DRILL PO-26-0397 20
18 Aug Dion Field WELD PO-26-0397 50 Rework ·
18 Aug Oliver Brewer INSP PO-26-0397 33